Tuan Giao District is located in the South East of Dien Bien Province with the majority of population are ethnic minorities, in which the percentage of needy households are 91.4% (2017). 18 out of 19 communes of Tuan Giao District are living in difficult state with the lack of equipment and education.

Education

On the occasion of the new school year, Volunteers For Education (VFE) and An Binh Commercial Joint Stock Bank (AB Bank) held the opening ceremony of Ta Pao school site of Sinh Phinh nursery school at 8:30 am on September 4th, 2020, in Sinh Phinh commune, Tua Chua district, Dien Bien province. The opening ceremony was...

After a period of consideration and research, VFE and VinID have chosen Ta La Cao school site as their cooperative project. Ta La Cao school site, Sinh Phinh nursery school is located 10 km away from the center of Tua Chua district, Dien Bien province. Ta La Cao school site was firstly built in 2007 and...

The Ta Pao school site, Sinh Pinh nursery school in the Tua Chua district has welcomed students since 26th March, 2020. The students and teachers are enjoying the fresh, new amenities in this Volunteers For Education Project. The new school provides a safe and beautiful learning environment. The gardens at the front of the school offer...

Put aside the outbreak of the coronaviruses to welcome the great news of our most recent project with the support of ABBank Vietnam - Ta Pao school site, Sinh Phinh nursery school in Tua Chua district. Due to the lockdown of Vietnam, we are unable to organise an opening ceremony for the Ta Pao school site...

After a period of time of consideration, VFE and ABBank Vietnam had chosen Ta Pao as a cooperation project. It is expected to be finished on the 1st of March, 2020. Ta Pao school site, Sinh Phinh nursery school is about 17km from the center. This is where 92 non-boarding students with only 3 downgraded classrooms...

In early June, VFE decided to finance the construction in Hang Sung 2 school site. The project includes: • 1 new classroom (36m2) • A toilet • A kitchen and an eating area. • A concrete playground (171 m2) • Refurbishing the two old classrooms. The construction in Hang Sung 2 was started on 5th June by an experienced local contractor....